13550035823
EN
EN
The solution
The solution
Office project solutions
The solution Time:2022-05-23

■ The main control objects of office building solution are: hall, elevator hall/corridor, office area, conference room, underground parking garage, flood lighting, etc.

■ Sled office lighting, the operation of the air conditioner coil, the curtain can according to indoor somebody/unmanned automatic control, when indoor when someone there, system will automatically open and maintain a lamplight, air-conditioning fan coil will be set according to the indoor temperature, adjust indoor temperature to comfort model, the curtain will be according to the outdoor sun Angle, white are adjusted to the right height. When there is no one in the room, the system will delay the light off, air conditioning coil off, to maintain the energy saving state;

■ Lighting and air conditioning in large office area can be dynamically controlled according to the number of people or no one in each partition; In order to prevent fire accidents caused by electrical outlets in large office areas, the system will automatically shut down all electrical outlets after work.

■ Garage lighting and exhaust are controlled according to peak and trough periods; The exhaust machine will dynamically exhaust air according to the air quality in the garage to ensure the health of the air system in the garage.

■ Central control center according to the project configuration data master server, data redundancy server, operation station, etc., to achieve the control of intelligent lighting system and system integration of the upper level management system;




Copyright © 2022 Shanghai Jialiang Electric Appliance Co., LTD. All Rights Reserved  Registration no :粤ICP备2021130991号